Skip to main content
CA C32 License #760658 Family-operated since 1990 Mon–Fri, 8am–5pm
(559) 442–4105
California Asphalt Professionals Fresno · The Central Valley

Home·Services·Maintenance & Repair

Maintenance & Repair

The work that
doubles a lot’s life.

Asphalt is a maintenance product. A lot that gets the right work at the right time can outlast its untreated neighbor by ten or fifteen years. Here’s the schedule, and here are the eight services we keep on hand to run it.

35+ Years in business
C32 License #760658
60+ Cities served
FREE Estimates

The maintenance schedule

What a Valley lot
actually needs, when.

The Central Valley is hard on pavement — triple-digit summer heat, expansive clay and adobe soils, and ground that swells and shrinks with irrigation cycles. A schedule like this one keeps a properly-installed lot in service for twenty-five years before it needs a full repave.

  1. Year 0

    Fresh install.

    New asphalt gets six to twelve months to fully cure before its first seal coat. We don’t rush this — sealing too early traps oils and softens the surface.

  2. Year 1–2

    First seal coat.

    The first protective seal coat goes on once the surface has cured. This is the layer that takes the UV beating instead of the asphalt underneath.

  3. Year 3–5

    Crack sealing & second seal.

    Hairline cracks start to show. We rout and fill them with hot crack sealant, then reseal. Done now, this is fifty dollars of work. Done later, it’s a five-figure repair.

  4. Year 7–10

    Slurry seal & striping refresh.

    A slurry seal restores texture and skid resistance. We re-stripe the parking spaces, repaint ADA markings, and replace any wheel stops or curb paint that’s faded.

  5. Year 12–15

    Patches & overlay.

    Localized failures get hot-patched. If the surface is worn but the base is sound, a one-and-a-half-inch overlay buys another decade without the cost of a full removal.

  6. Year 20–25+

    Time to repave.

    Even maintained asphalt eventually needs to come up. When it’s time, we’ll be straight with you about it — and the proper schedule means you’ll have gotten every last year out of the original install.

What we do

Eight services
we keep on hand.

Crack repair & patchwork

Hot-applied Crafco sealant for working cracks; cold patch for emergencies. The single highest-return maintenance line item.

Seal coating

Protective surface coat that takes UV damage instead of the asphalt. Apply on a proper schedule, double your pavement life.

Slurry seal

An asphalt-emulsion / aggregate slurry that restores texture and surface friction without a full overlay.

Hot patching

Localized failure repair using hot asphalt mix. Cleaner edges, better bond, longer service than cold patch.

Line striping

Fresh parking-stall layout, lane lines, fire lanes, curb striping — in long-life thermoplastic or standard traffic paint.

ADA-compliant spaces

Accessible parking layout to current California ADA requirements — spaces, access aisles, ramps, signage.

Pavement resurfacing

Mill-and-fill or full surface course replacement when the wear layer is failing but the base is still sound.

Overlays

One-to-two-inch new surface course laid over existing asphalt. Cheaper than a repave, lasts ten-plus years.

From a crack-fill customer

Nick has the best crack fill in the industry, stays sealed throughout winter and summer! Easy to work with and with top integrity not common in today’s world, I will not call anyone else except California Asphalt Professionals.
Chuck Google Review

Get a free
maintenance estimate.

One business day reply. Or call (559) 442–4105 — we answer.

Recent maintenance work

Our crews, on the job.

See the full project gallery →

Get a free estimate

Tell us about the lot.
We’ll come look.

(559) 442–4105