Monterey County · Highway 101
Striping in Gonzales —
the first thing customers see.
Gonzales property owners have been calling the same Fresno number for line striping for a long time — (559) 442-4105, ours since the flip-phone era. A scheduled trip west — we group Salinas Valley work into dedicated weeks, and the crew that shows up is the one that gave you the number.
Gonzales sits at the north end of the Salinas Valley on Highway 101, between Soledad and Salinas. A close-knit agricultural community with residential paving and small commercial needs that we work on regular Salinas Valley trips.
Gonzales scheduling combines with our Salinas, Soledad, and Greenfield work to spread the trip across multiple jobs.
Gonzales is working wine country — vineyard blocks to the ridges, a growing ag-industrial park by the 101, and a small-town core that’s been there since the railroad. Winery crush pads, equipment yards and tasting-room lots all need surfaces that handle harvest truck traffic without complaint.
Around Gonzales, the Salinas Valley end of our range — wine-country and row-crop properties where we group jobs into dedicated trip weeks. We know the roads (Highway 101) and the ground — and both matter more to a paving quote than most people think.
Striping in Gonzales
Layout, paint, compliance.
Parking-lot layout and striping: stalls, fire lanes, crosswalks, directional arrows, curb painting, and ADA-compliant accessible stalls with correct signage, aisle widths and slope placement. Striping is the part of your property every visitor sees from their windshield — and the part an ADA plaintiff’s attorney sees first, too. Our C-32 classification is literally this: Parking & Highway Improvement.
How a striping job runs.
New layouts get chalked and approved before paint. Re-stripes match existing layout or fix it where the old layout wastes stalls. Water-based traffic paint standard, thermoplastic where durability pays for itself. ADA work follows current CBC/ADAAG dimensions — stall counts, van aisles, signage heights — documented with photos.
Why this shop
How the estimate works.
Here’s what an estimate looks like: a real site walk in Gonzales, measurements on paper, a straight answer about what the surface needs now versus what can wait — and a written number. Valley heat, expansive clay and irrigation cycles punish shortcuts; thirty-plus years here taught us which corners never to cut.
One call starts it: (559) 442-4105. Photos of the surface help; the site walk settles it.
Striping questions
Asked before every
Gonzales job.
Re-stripe or re-layout?
If the old layout works, a re-stripe over clean asphalt is quick and cheap. If stalls are tight, flow is backwards, or the ADA count is short, a re-layout fixes problems paint alone can't — and often finds you extra spaces.
Do you stripe after sealcoating?
Always — sealcoating buries the old lines, so striping is the finishing step of every sealcoat job we do. If someone else sealed your lot and left it black, we can lay the lines back down.
How soon can you get to Gonzales?
Gonzales work rides a scheduled trip west — we group Salinas Valley work into dedicated weeks. Tell us your timeline when you call; we book those trips ahead, and grouping the jobs is exactly what keeps far-side pricing reasonable.
